Thursday, February 20, 2014

Documentary Production Schedule (Blog #4)

Luckily we were able to lock down an interview with someone at the Cotton Exchange. Especially since the Black Cat Shoppe was unresponsive to our group about setting one up.  So the production schedule for my group's documentary project all takes place within this week:

Wednesday:
3:30 PM : Pick up gear from Equipment Room
4:00 PM : Go downtown, to the Cotton Exchange, and film Vox pop interviews and some more B-roll footage. Talk to about 4 to 5 people about the Cotton Exchange (It's history, the shops, the ghost tours, etc.) Finish shooting around 5:30 to 6:00 PM.

Thursday:
Start editing vox pops and b-roll footage either in or after 201 class.

Saturday:
11:00 AM: Prep gear for A-roll interview
12:00 PM: Go downtown to the Cotton Exchange to film interview with the owner of the Cotton Exchange store. The interview, along with set up and take down, shouldn't take more than an hour to do. So plan to finish by 1:00 PM, 2 PM at the latest.

Sunday:
Start editing the A-roll interview in with the Vox pops and the b-roll footage. Finish a first cut, then compress the video down to 2 minutes (If I have to). Hopefully get most of it done. Plan to finish it by Monday night.

Thursday (2/27):
Due date for the documentary.

No comments:

Post a Comment